Construction of new steam and electric generation facility within an existing structure at Howard University. Full scope across two work orders includes
New service utilities run throughout site
Installation of micropile foundations and SOE for deep excavations
New Translucent wall panel (Windows) installation.
Earthwork including excavation, backfilling, grading and asphalt paving
Concrete work including shuttering, reinforcement steel, pouring, concrete repair and core drilling
Demo work: steel, concrete , bricks, etc
UST and storm tech systems installation
Drywall , brick and CMU walls
Paint, coating and internal finishing work
Doors and frame installations
Grouting and flooring work
Steel structural work and secondary steel support
Roofing and waterproofing
Fence installation
Fire protection system
All required scaffolding rigging, lifting and storage activities associated with the aforementioned works
Project is located among several buildings including dormitories and classrooms, and is therefore subject to heavy foot and road traffic, requiring significant safety control. The building is being restored to maintain historic requirements as determined by Howard University. Construction of new steam and electric generation facility within an existing structure at Howard University. Full scope across two work orders includes